ConCom 5/18/16: Perch Pond Dredging, Nourishment of Beach off Great Bay

POSTPONED (“CONTINUED”) UNTIL MAY 18, 2016

Below is an announcement of a Conservation Commission (ConCom) meeting on Wednesday April 13, regarding the dredging of the Perch Pond outlet into Great Pond providing “beach nourishment” to the beach head between Harrington and English Streets.

This outlet has been dredged in the past with mixed reviews on the quality of “nourishment” materials which one of our members said contained broken bottles, wire and other undesirable materials.

We have been informed that the quality of the dredged material is a component of the project over which ConCom has jurisdiction.

If you have concerns, comments, observations, and/or information to share with the ConCom Board, you can convey them by speaking at the 4/13 ConCom meeting and/or emailing them at concom@falmouthmass.us .

Two Enterprise articles of interest are:

Nov. 19, 2015 Residents-seek-permit-to-dredge-perch-pond/article

and

Dec. 29, 2015  Falmouth-residents-to-fund-erosion-mediation-on-great-bay-street

…………………………………………
Falmouth Conservation Commission
AGENDA, Wednesday, APRIL 13, 2016, 7:00 P.M.
Selectmen’s Meeting Room, Falmouth Town Hall

CONTINUED REQUEST FOR HEARING UNDER A NOTICE OF INTENT

Perch Pond Preservation, Inc., Perch Pond navigation channel and nearby beaches, East Falmouth, MA – For permission maintenance dredge the Perch Pond entrance channel from Great Pond 40-ft wide x 650-ft long to a depth of 4-ft and provide beach nourishment with approximately 1,100 cu yds of sandy sediment from just north of the Harrington Street boat ramp to just south of the east end of English Street and the associated excavating, grading and landscaping.